Electrical Engineer

11/24/2021 - 04/30/2023
Debbas Enterprises

WORK PROJECTS Debbas Enterprises, Qatar Construction of CP-07B Lusail plaza infrastructure LRT Station, Car Park and Landscape., QDSBG., construction, Lusail City. 800.15 MWp Solar project, Al kharsaah, Sungrow, power china, SIRAJ. Achievements/Tasks - Managed electrical infrastructure projects in Lusail Plaza Basement Car Parking Area, ensuring quality and timely completion. - Coordinated installation of MV & LV switchboards, transformers, MCC panels, VFD, DB, SMDB, and sockets. - Conducted switching operations for LV switchgear, MCC, MSB, ESMSB, SMDB, and lighting systems. - Implemented String Inverters (SG250HX PV) and MV stations (MVS6750-LV) installations, maintaining strict adherence. - Oversaw testing and commissioning of String inverters and PV panels to ensure optimal performance. - Supervised string connection, cable laying, earthing, MPPT voltage, and string voltage and current checking. - Facilitated software upgrades and commissioning of String inverters using iSolar Cloud software. - Collaborated with project stakeholders, providing technical support and ensuring clear communication. - Monitored project progress and resolved issues promptly, maintaining project timelines and quality standards. - Adhered to safety protocols and regulations, ensuring a safe work environment for team members.

Sr.Project Engineer

07/28/2015 - 06/10/2020
Special Technical Services

Work Projects; special Technical Service LLC, Oman - Construction and Installation of well site Facility - E&I –BP-Khazzan - Phase-1 & 2 (96 Gas wells). - Water Desalination plant- Barka Independent Water Project (IWP)-E&I, Suez International. - Bisat Early Production Facility (Gas-Oil Separation, storage & Export Systems) OOCEP. - Yibal Khuff Project (YKP) Wellhead Modular Skids. (28 Skid), PDO. - Rabab Gas Dehydration & Harweel MGI Dehydration Package Skid Work, PDO. - Marmul Rationalization project, Cameron Skid, PDO. - Swis (STS Worley Integrated Solutions) EPC Service contract at BP Khazzan, Block 61. Achievements/Tasks - Supervised electrical activities, managing cost, resource deployment, time overruns, and quality and safety compliance. - Analyzed technical drawings, interpreted specifications, and determined electrical requirements for various projects. - Designed and prepared shop drawings for lighting, earthing, and power systems, performing voltage drop calculations, load distribution scheduling, and schematic drawing. - Directed installation of electrical and instrument equipment, ensuring adherence to project specifications and standards. - Coordinated installation of cathodic protection, fire alarm, and HVAC systems to ensure proper functioning. - Attended construction, progress, and engineering meetings, maintaining open communication with clients and consultants. - Supported procurement of materials by providing technical expertise and ensuring adherence to project specifications. - Developed work schedules, daily reports, monthly reports, look-ahead plans, material requests, and reconciliations. - Conducted material take-offs for all E&I items, based on issued AFC drawings, ensuring accuracy and project efficiency.

Electrical Engineer

12/27/2010 - 03/17/2015
Control and application Emirates

Work Projects control & Application Emirates, Abu Dhabi, UAE - NEW 400kV/132Kv Grid Station, Bahia, Toshiba Corporation, Transco. - Integrated Gas Development-E&I construction work, Das Island, Abudhabi, ADGAS. - Waste Water Treatment Plant ISTP-2 construction works, Allahamah, Al Ain, ADEWA. - Electrical maintenance in gas process plant, GASCO, Ruwais. Achievements/Tasks - Overseeing the installation of electrical equipment such as MV/LV switchgear, transformers, UPS, RMU, NER, workstations/ server cabinets, marshaling cabinets, and system panels; managing installation of 400kV GIS, GIB, 132kV GIS, 33kV GIS, 500MVA transformers, 50MVAr reactors, protection panels, and local control panels; supervising installation of cable trays, conduit supports, MV/LV power, instrumentation, communication, and FO cables, earthing, lighting, and lighting systems. - Conducted oil filtration for 500MVA transformers and 50MVAr reactors, ensuring optimal performance. - Performed calibration, installation, and pre-commissioning works for field instruments. - Coordinated installation of lighting, earthing, heat tracing, and cathodic protection systems. - Executed electrical installations in accordance with Electricity Wiring Regulation 2007 (Rev1) BS7671, IEE Wiring Regulation, UK while ensuring compliance with hazardous area classifications and zone classifications.

ETA Infotech

11/23/2010 - 11/19/2007
ETA Infotech

work project: ETA InfoTech LLC, Dubai, UAE - 3.6MW HFO POWER PLANT WORK, Rashalkhaima. - 80 TPH cement grinding and packing plant, ADEN, Yemen. - Preparation of shop drawings for Mirdif City Center, Dubai. - Designing and preparing shop drawing of Residential villa, Dubai. Achievements/Tasks: Responsible for coordinating with clients, project managers, construction managers, design teams, QC, HSE, and project teams to ensure efficient work coordination; assisting in testing and commissioning of LT cables, HT cables, ACB, VCB, breakers, busbars, LT motors, transformers, RMU, and earth grinds; designing and preparing shop drawings for lighting and power systems for high-rise buildings, adhering to established standards; conducting voltage drop calculations, transformer selection, panel selection with feeders, and breaker selection to optimize project outcomes, and preparing shop drawings for low current systems such as SMATV, CCTV, and telecom.

Electrical Engineer

06/07/2005 - 10/22/2007
Sabari and Leon Electrical and PVT LTD

Work Project: Sabri and Leon Electrical (Pvt) Ltd, Chennai, India - Datacenter with substation work 1000kVA,11kv/415v, IIT. - 25kv switch yard work (415v/25kv, 250kva, 11kv/25kv, 500kva), ICF. - Automatic paint shop with substation 4 no’s, 11kv/415v, 500KVA, ICF. - 25KV, OHV line work for EMU coaches, ICF. Achievements/Tasks Responsible for managing data center substation work (1000kVA, 11kV/415V) and 25kV switchyard work (415V/25kV, 250kVA, 11kV/25kV, 500kVA); overseeing automatic paint shop substation installation (4 units, 11kV/415V, 500KVA) and 25KV overhead line work for EMU coaches; coordinating project activities, ensuring timely completion and adherence to project specifications; monitoring installation of electrical equipment and systems, ensuring compliance with relevant standards and regulations, and collaborating with team members and project stakeholders, ensuring clear communication and efficient work processes.

Portfolio

Skills

Project Management
98%

Awards

Electricity wiring regulation

2013
DDC competency certificate Holder (Electricity wiring Regulation E1), Ecoman consultant, Abu Dhabi

Electrical competency” Training, Vibrant, UID No:VC2022023204 (09/2024)

2022
Electrical competency” Training, Vibrant, UID No:VC2022023204 (09/2024)

Permit to work Receiver” Training, Vibrant, UID No:VC2022023335 (09/2024)

2022
Permit to work Receiver” Training, Vibrant, UID No:VC2022023335 (09/2024)

Distribution Code Review Panel: Authorized to carry out works of Electrical Distribution companies (B grade) in Oman

2016
Distribution Code Review Panel: Authorized to carry out works of Electrical Distribution companies (B grade) in Oman

UPDA”: Certified Engineer in Qatar (Certificate No: 31800).